Saturday, October 31, 2009

Saturday 31st October 2009 - Roof trusses delivered

OK, first of all, more of the same from yesterday (Phil can't be trusted to take all the necessary photos)
View from the front:
View from the back:
Front left:
Our remaining roof trusses have been delivered. Yay! Good omen for Tuesday we're hoping.

Friday, October 30, 2009

Friday 30th October - Bricking on upper level

Another day, another stack of bricks laid. . . they're now well into the second level above the garage. . . here's a view from the front:
From the side (garages with bedroom window above) - Which was originally going to be up higher (top of the window used to be level with the piece of wood in the frame above). . .as per the plan. . . but it was higher than the other window in that bedroom (one of the front windows) so we decided we wanted them both on the same level. Thanks for lowering it Jeff!
Around the back - the second window along the back wall is the bathroom window, also a window that we need to lower, so it sits right on top of the spa bath - I'm going to spend lots of hours sat in the warm bubbles with the window up looking out at the lovely view. . . of the cars zooming by on the main road behind! bugger.



Thursday, October 29, 2009

Thursday 29th October - Scaffolding!

It was getting a bit dark when we got out there tonight, but we were delighted to find scaffolding! Hurrah! This means that they will be able to start on the upper level above the garage. Jeff's told us that bricking should be finished on Monday, then roof trusses should be put up Tuesday and Wednesday, and the tin roof to be started on Thursday (which should take a week). Looks like the brickies may be finished on time (or, if not, they're very close) which is excellent considering the awful weather we've had this week.

Front portico is finished (in the dark)

Scaffolding up around the back (in the dark) Scaffolding up around the alfresco (in the dark)

Wednesday, October 28, 2009

Wednesday 28th October - still more brickwork

Crappy weather all week, and still the brickies work!

Around the front - they've started doing the columns for the front portico:
Brickwork around the front is coming along nicely:
Master bed area at rear is done:
Some of the front windows are done - protruding brick frame around the front ones that we're going to paint to look like an architrave (cheaper way of doing it, apparently!)
View from the back:
View from the front. . . from up the hill on somebody else's property (they haven't started building yet. .. actually, I don't even know if it's sold yet.)
Can't wait to see it from this angle when it's got a lid on!








Monday, October 26, 2009

Monday 26th October - more brickwork

More brickwork! And in the pouring rain too!!!! Good onya guys!!!!

They've started coming round the front:
They've come around the side wall (Master bed side):

Around the back. . .




Friday, October 23, 2009

23rd October - plumbing, brickwork

Plumbing started and brickwork re-commenced - they've laid the bottom two courses of bricks to the perimeter of the house and they've started doing round the back of the house.

Thursday, October 22, 2009

Windows In

Windows were installed today:

Master bed window - it's a whopper!


Stacka doors in the living room

Kitchen window

Dining room

View of the house from the front (they've also put up the frame for the portico)
Bedroom window above the garage doors

View from the back, from left to right - bedroom, bathroom, laundry, dining, kitchen, living, master bed. (The frame for the alfresco roof is also up)

Wednesday, October 21, 2009

Framing Finished

I went out to the site this morning, as I had a couple of other things to do in the area (and couldn't resist). . . there were four framers running around like crazy people fixing up our frame. . . it was only 10am and it looked like they'd nearly finished! By the time Phil got there tonight, the job was a good en. Great job guys! Apparently windows will go in tomorrow, then bricking will be finished, then roof struts, then roof. . . yeehargh!

Looking through this wall is the master bedroom, taken from the living room, you can see the big rectangular frame bit which is the shape of the recess for the TV.

This is the wall at the back of the living room, you can just see the three rectangles in the frame that will be three cutouts in the gyprock.
The living room.
Took from the dining room, looking through the rumpus room up to one of the bedrooms.
Looking from the rumpus again, up the hallway towards the bedrooms (see the step in the middle at the bottom, that's the difference in height between the two levels).
Looking down from the hallway outside the bedrooms, rumpus is on the left, dining on the right.

Looking in at the back wall of the living room again, theatre room is to the back left, WIR back middle, ensuite back right, master bed right.

Looking at where the stacka doors will go from the alfresco
In the dining room, looking through to the laundry and powder room.
Looking at the back of the house from the alfresco, kitchen window space, dining room window space (x3), laundry window space, bathroom window space, bedroom window space.
View of the front of the house, from the right - bedroom, WIR, bedroom, rumpus (with garage underneath of course).
Another view from the front.

View from the front left. . . you can see the slab coming out for the front portico (which will be tiled) (though we haven't pulled our fingers out and chosen tiles yet, we're saving that argument for another time!)
View from the West - master bed to the left, ensuite to the right.
Full view of the back of the house-to-be.

















Tuesday, October 20, 2009

Framing Started

They've started framing! Hurrah! They look like they've finished the framing in the garage. . .

Joists for the first floor, above the garage (is that what they're called?):

This is where the staircase will go up to the main house:
View towards the back of the garage:
The carcass for the staircase:
Big steel beam that will support the top floor. . . rather unfortunately there'll be a post going down to the ground from it. . . wonder who'll be the first to drive into it and have the house falling on my head??? (me)

This is the top floor taken from the main slab. The laundry is on the lower level, the powder room fits into the little nook and the closest raised bit is where the stair (or two) will go up to the top level. . . there's only 30cm difference between the two levels.
Top level
Top level again. . . bedroom at the front right, walk-in-robe is the jutty out bit then theres another bedroom to the left.