View from the front:
Saturday, October 31, 2009
Saturday 31st October 2009 - Roof trusses delivered
OK, first of all, more of the same from yesterday (Phil can't be trusted to take all the necessary photos)
View from the front:
View from the back:
View from the front:
Friday, October 30, 2009
Friday 30th October - Bricking on upper level
Another day, another stack of bricks laid. . . they're now well into the second level above the garage. . . here's a view from the front:
From the side (garages with bedroom window above) - Which was originally going to be up higher (top of the window used to be level with the piece of wood in the frame above). . .as per the plan. . . but it was higher than the other window in that bedroom (one of the front windows) so we decided we wanted them both on the same level. Thanks for lowering it Jeff!
Around the back - the second window along the back wall is the bathroom window, also a window that we need to lower, so it sits right on top of the spa bath - I'm going to spend lots of hours sat in the warm bubbles with the window up looking out at the lovely view. . . of the cars zooming by on the main road behind! bugger.
Thursday, October 29, 2009
Thursday 29th October - Scaffolding!
It was getting a bit dark when we got out there tonight, but we were delighted to find scaffolding! Hurrah! This means that they will be able to start on the upper level above the garage. Jeff's told us that bricking should be finished on Monday, then roof trusses should be put up Tuesday and Wednesday, and the tin roof to be started on Thursday (which should take a week). Looks like the brickies may be finished on time (or, if not, they're very close) which is excellent considering the awful weather we've had this week.
Front portico is finished (in the dark)

Front portico is finished (in the dark)
Wednesday, October 28, 2009
Wednesday 28th October - still more brickwork
Crappy weather all week, and still the brickies work!
Around the front - they've started doing the columns for the front portico:
Brickwork around the front is coming along nicely:
Around the front - they've started doing the columns for the front portico:
Monday, October 26, 2009
Monday 26th October - more brickwork
Friday, October 23, 2009
23rd October - plumbing, brickwork
Thursday, October 22, 2009
Windows In
Wednesday, October 21, 2009
Framing Finished
I went out to the site this morning, as I had a couple of other things to do in the area (and couldn't resist). . . there were four framers running around like crazy people fixing up our frame. . . it was only 10am and it looked like they'd nearly finished! By the time Phil got there tonight, the job was a good en. Great job guys! Apparently windows will go in tomorrow, then bricking will be finished, then roof struts, then roof. . . yeehargh!
Looking through this wall is the master bedroom, taken from the living room, you can see the big rectangular frame bit which is the shape of the recess for the TV.

This is the wall at the back of the living room, you can just see the three rectangles in the frame that will be three cutouts in the gyprock.
The living room.
Took from the dining room, looking through the rumpus room up to one of the bedrooms.
Looking from the rumpus again, up the hallway towards the bedrooms (see the step in the middle at the bottom, that's the difference in height between the two levels).
Looking down from the hallway outside the bedrooms, rumpus is on the left, dining on the right.

Looking in at the back wall of the living room again, theatre room is to the back left, WIR back middle, ensuite back right, master bed right.
Looking at where the stacka doors will go from the alfresco
In the dining room, looking through to the laundry and powder room.
Looking at the back of the house from the alfresco, kitchen window space, dining room window space (x3), laundry window space, bathroom window space, bedroom window space.
View of the front of the house, from the right - bedroom, WIR, bedroom, rumpus (with garage underneath of course).
Looking through this wall is the master bedroom, taken from the living room, you can see the big rectangular frame bit which is the shape of the recess for the TV.

This is the wall at the back of the living room, you can just see the three rectangles in the frame that will be three cutouts in the gyprock.
The living room.
Took from the dining room, looking through the rumpus room up to one of the bedrooms.
Looking from the rumpus again, up the hallway towards the bedrooms (see the step in the middle at the bottom, that's the difference in height between the two levels).
Looking down from the hallway outside the bedrooms, rumpus is on the left, dining on the right.
Looking in at the back wall of the living room again, theatre room is to the back left, WIR back middle, ensuite back right, master bed right.
Looking at where the stacka doors will go from the alfresco
In the dining room, looking through to the laundry and powder room.
Looking at the back of the house from the alfresco, kitchen window space, dining room window space (x3), laundry window space, bathroom window space, bedroom window space.
View of the front of the house, from the right - bedroom, WIR, bedroom, rumpus (with garage underneath of course).Tuesday, October 20, 2009
Framing Started
They've started framing! Hurrah! They look like they've finished the framing in the garage. . .
Joists for the first floor, above the garage (is that what they're called?):

This is where the staircase will go up to the main house:
Joists for the first floor, above the garage (is that what they're called?):

This is where the staircase will go up to the main house:
View towards the back of the garage:
Big steel beam that will support the top floor. . . rather unfortunately there'll be a post going down to the ground from it. . . wonder who'll be the first to drive into it and have the house falling on my head??? (me)