They've started framing! Hurrah! They look like they've finished the framing in the garage. . .

Joists for the first floor, above the garage (is that what they're called?):

This is where the staircase will go up to the main house:
View towards the back of the garage:
The carcass for the staircase:
Big steel beam that will support the top floor. . . rather unfortunately there'll be a post going down to the ground from it. . . wonder who'll be the first to drive into it and have the house falling on my head??? (me)

This is the top floor taken from the main slab. The laundry is on the lower level, the powder room fits into the little nook and the closest raised bit is where the stair (or two) will go up to the top level. . . there's only 30cm difference between the two levels.
Top level
Top level again. . . bedroom at the front right, walk-in-robe is the jutty out bit then theres another bedroom to the left.